2027 Medicare Physician Fee Schedule Final Rule: 5 Key Changes for Healthcare Providers
2027 Medicare Physician Fee Schedule Final Rule: 5 Key Changes for Healthcare Providers

2027 Medicare Physician Fee Schedule Final Rule: 5 Key Changes for Healthcare Providers

2027 Medicare Physician Fee Schedule Final Rule: 5 Key Changes for Healthcare Providers

The Centers for Medicare & Medicaid Services (CMS) has finalized its Calendar Year 2027 Physician Fee Schedule on November 4, 2026 and it takes effect January 1, 2027. For most Healthcare Professionals, the conversion factor falls 2.31% to $32.63 and four other changes reach the claims your team will send in the first week of January: a new payment cut for same day E/M visits, the end of G2211, new remote monitoring rules and a rebuilt practice expense formula.

If you bill Medicare Part B, each change touches your fee schedule, your charge templates or both and most need attention before the first January claim goes out. For each one, you will find what CMS finalized, how it differs from the July proposal and what to update.

What Are the 5 Key Changes in the 2027 Medicare Physician Fee Schedule?

CMS finalized five major changes to the 2027 Medicare Physician Fee Schedule that affect physician reimbursement, medical billing and practice operations:

  1. Medicare Conversion Factor Reductions: Payment conversion factors decrease by 1.83% for qualifying APM participants and 2.31% for other clinicians.
  2. Same-Day E/M Payment Adjustments: Medicare reduces payment for the lower-valued eligible service by 20% when an E/M visit and a 0-day global procedure occur on the same day.
  3. G2211 Replacement With B1 and B2 Modifiers: CMS replaces G2211 with modifiers B1 and B2, providing 16% and 32% payment increases for qualifying services.
  4. RPM and RTM Billing Updates: New patient eligibility and initiating-visit requirements take effect in 2027, while the clinical staffing requirement is delayed until 2029.
  5. Practice Expense RVU Revisions: CMS introduces changes to indirect practice expense calculations, including a phased replacement of the existing methodology.

We will explore these changes in more detail later in this guide. 

What is the Medicare physician fee schedule?

A physician fee schedule is the list of payment amounts a payer uses for professional services. Medicare’s version, the Medicare Physician Fee Schedule (PFS), has set payment for the services of physicians and other billing professionals since 1992. It covers office visits, procedures, diagnostic tests and most other professional services billed under Part B.

Medicare does not assign each CPT code a flat dollar amount. Each service gets relative value units (RVUs) for three things: the physician’s work, the practice expense and malpractice expense. Those RVUs are adjusted by geographic practice cost indices (GPCIs) for the local area and then multiplied by the conversion factor to produce a payment.

How is a Medicare physician fee schedule payment calculated?

The formula looks like this:

Payment = [(work RVU x work GPCI) + (PE RVU x PE GPCI) + (MP RVU x MP GPCI)] x conversion factor

The conversion factor is the only part of the formula that moves every code at once, which is why it gets most of the attention each November.

What is the difference between facility and non-facility rates?

Office services usually get the non-facility rate, which covers the full cost of running the visit. Services in a hospital outpatient department or ambulatory surgical center get the lower facility rate, because the facility bills for its own costs separately. The CMS Physician Fee Schedule Look-Up Tool shows the RVUs and payment amounts for any code by locality.

1. The Medicare conversion factor drops for 2027

Since 2026, the law requires two conversion factors: one for qualifying participants in Advanced Alternative Payment Models (QPs) and one for everyone else. Both go down in 2027.

Conversion Factor20262027 FinalChange
Qualifying APM participants (QPs)$33.57$32.95-$0.62 (-1.83%)
Non-qualifying APM (most clinicians)$33.40$32.63-$0.77 (-2.31%)

The decrease comes mostly from Congress. Public Law 119-21, which CMS calls the Working Families Tax Cut legislation, gave the PFS a one-year 2.50% increase for 2026 and that increase expires on December 31, 2026. The statutory updates for 2027 (+0.75% for QPs and +0.25% for everyone else) offset part of the loss and CMS applied an estimated -0.12% adjustment for changes in work RVUs.

The final cut is deeper than the July proposal, which projected decreases of 1.19% for QPs and 1.68% for non-QPs. Physicians Practice reported that the work RVU adjustment moved from +0.53% in the proposal to -0.12% in the final rule, which accounts for most of the gap.

Example: A service with 2.00 total RVUs (after geographic adjustment) paid $66.80 at the 2026 non-QP rate. At $32.63, it pays $65.26 in 2027, a drop of $1.54 per service before any code-level RVU changes.

Check your commercial contracts too. Any payer contract written as a percentage of the current Medicare fee schedule will move when the conversion factor does.

2. CMS Reduces Payment for Lower Valued Same Day E/M and Procedures by 20% 

This is the change most likely to show up in your January remittances. When a separately identifiable office or outpatient E/M visit is billed on the same day as a procedure with a 0-day global period, Medicare will pay the more expensive service at 100% and the other service at 80%.

CMS scaled the policy back after public comment. The proposal would have paid the second service at 50% and applied to 10-day and 90-day global procedures as well.

July 2026 ProposalNovember 2026 Final Rule
Payment for the lower-paid service50%80%
Global periods affected0-day, 10-day and 90-day0-day only
Who triggers itSame physician or a physician in the same practiceSame physician or a physician of the same specialty in the same group

According to Physicians Practice’s reading of the final rule, visits furnished on the same day by physicians of different specialties in the same group are not subject to the reduction. CMS estimates dermatology, otolaryngology and podiatry will see the largest effects.

Example: A dermatologist sees an established patient for a new rash (E/M with modifier 25) and performs a 0-day global biopsy on a separate lesion at the same visit. Starting in 2027, whichever service pays more is paid in full and the other is paid at 80%.

The documentation standard for modifier 25 stays the same: the record still has to support a significant, separately identifiable E/M service.When a separately identifiable E/M visit is reported with an eligible 0-day global procedure, Medicare generally pays the higher-valued service at 100% and reduces payment for the other eligible service to 80%. 

3. G2211 is replaced by modifiers B1 and B2

G2211 was an add-on HCPCS code that Medicare paid for the extra complexity of longitudinal office and outpatient E/M care. Medicare began paying HCPCS code G2211 on January 1, 2024. For dates of service in 2027, it is retired and replaced by two modifiers that attach directly to the E/M code.

Modifier B1: Increases payment for the associated E/M code by 16%. In CMS’s words, the modifier works “instead of a flat rate, maintaining an equal percentage increase across all levels of E/M codes.”

Modifier B2: Increases payment for the associated E/M code by 32%. It is available only to practitioners participating in a Medicare Shared Savings Program ACO and to Participant Providers in a Long-term Enhanced ACO Design (LEAD) Model ACO.

B2 is voluntary and it can be billed for any beneficiary the ACO participant treats, not only patients assigned to the ACO. Modifiers B1 and B2 do not apply to every E/M visit. Their use depends on the patient’s longitudinal care relationship, the type of E/M service and the practitioner’s eligibility. CMS also maintains restrictions when modifier 25 is reported, with specified exceptions for preventive services. B1 and B2 should not be reported together for the same qualifying service. 

For billing teams, the practical work is template cleanup. Remove G2211 lines from charge templates and build B1 (or B2 where it applies) into the E/M line itself. Because the modifier is a percentage, a level 5 visit now gains more in dollars than a level 3 visit, which was not true under the flat G2211 payment.

4. New RPM and RTM requirements, with the staffing rule delayed to 2029

CMS proposed four changes to remote physiologic monitoring (RPM) and remote therapeutic monitoring (RTM). It finalized three of them for 2027 and pushed the fourth back two years.

RequirementApplies ToEffective
Services may be furnished only to established patientsRTM onlyJanuary 1, 2027
A separately reportable initiating visit must be furnished when monitoring beginsRPM and RTMJanuary 1, 2027
Updated valuation of the servicesRPM and RTMJanuary 1, 2027
Payment only when performed by clinical staff employed by the practice, not contractorsRPM and RTMJanuary 1, 2029

CMS requires a qualifying initiating visit before RPM or RTM services begin. The visit may take place in person or through eligible telehealth, and remote monitoring does not have to be its primary purpose. However, the practitioner must discuss the monitoring plan with the patient. A separate initiating-visit claim is not required in every circumstance. If your vendor materials say both services now require an established patient, they are overstating the rule.

CMS said the delay of the employed staff requirement gives practices more time to adapt. Practices using external RPM or RTM vendors should review their staffing arrangements before January 1, 2029. The new requirement affects payment for certain monitoring services performed by contracted rather than employed clinical staff. CMS also asked for comment on bundling the RPM and RTM CPT codes into four new HCPCS G-codes and it said it may use those comments in future rulemaking.

5. A new method for calculating indirect practice expense

Practice expense RVUs cover the cost of running a practice: staff, supplies, equipment, rent and overhead. CMS has relied on AMA survey data for much of this and the fact sheet calls those surveys “resource-intensive but ultimately unreliable.” The agency says it is moving toward “more objective, routinely updated and auditable cost data.”

For 2027, CMS finalized three changes to how indirect practice expense is calculated. First, it is phasing out the indirect practice cost index (IPCI) over two years. The IPCI kept each specialty’s total practice expense RVUs in line with practice expense per hour data from 2007 or earlier. According to the American Academy of Audiology’s summary of the rule, half of the IPCI comes out in 2027 and the rest in 2028.

Second, CMS introduces a practice expense RVU stabilization adjustment to limit annual fluctuations for applicable services. The 5% adjustment does not apply universally, as certain new, revised, revalued and newly nationally priced codes are excluded. Changes in total Medicare reimbursement may also differ from the practice expense adjustment. 

Third, indirect practice expense will be allocated using both the work RVU and the clinical labor PE RVU. Until now, CMS used whichever of the two was higher. The new method applies to all codes except those with 10-day and 90-day global periods.

CMS also adjusted the indirect practice expense allocation for visits to patients in a Part A skilled nursing facility stay, in line with the site of service differential it finalized for 2026.

These changes shift RVUs between specialties and between codes, so the only reliable way to see your exposure is to compare your top codes in the 2027 Addendum B RVU file with your 2026 rates.

Other changes in the 2027 final rule

CMS finalized several smaller policies that matter to specific practices. Two new codes, G0572 and G0573, cover advance care planning furnished by clinical staff under direct supervision and CPT codes 99497 and 99498 are now limited to time the billing practitioner personally spends. Shared medical appointments get separate coding and an add-on code for extra time. Collaborative Care (CoCM) codes receive higher work RVUs and smoking cessation and SBIRT services join the final year of the four-year increase for timed behavioral health services.

The Consolidated Appropriations Act, 2026 waives the in-person visit requirement for telehealth mental health services through December 31, 2027. CMS is pausing the global surgery data collection required by MACRA. Payment reductions under the Clinical Laboratory Fee Schedule are capped at 15% a year through 2029. The rule also adds a new add-on code for diagnosing and treating vaccine adverse effects and recognizes diabetes self-management training and medical nutrition therapy as stand-alone billable visits at rural health clinics.

How to prepare your practice before January 1, 2027

TaskWhat to Do
Fee schedulesLoad the 2027 conversion factor and Addendum B RVUs; recalculate expected payment for your top 20 codes
Commercial contractsFlag any contract priced as a percentage of the current Medicare fee schedule
G2211Remove it from E/M templates for 2027 dates of service; add B1 or B2 for eligible ACO and LEAD participants
Same-day visitsList your 0-day global procedures and estimate the effect of the 80% payment on visits billed with modifier 25
RTMConfirm every new RTM patient is an established patient and has a documented initiating visit
RPMConfirm the initiating visit; start planning for the 2029 employed staff requirement if you use a vendor
Payment postingSet up a variance report for January remittances so underpayments are caught in the first weeks

Conclusion

The 2027 rule lowers the conversion factor to $32.63 for most clinicians, pays the lower-priced service at 80% when an E/M visit and a 0-day global procedure fall on the same day, replaces G2211 with B1 and B2, adds RTM and initiating visit requirements and starts a two-year rebuild of indirect practice expense. Each change takes effect January 1, 2027, except the RPM and RTM staffing rule, which waits until 2029.

Frequently asked questions about the 2027 Medicare physician fee schedule

What is a physician fee schedule?

A physician fee schedule is a list of payment amounts for professional services. Medicare’s version sets payment for each service using relative value units, geographic adjustments and a conversion factor.

When does the 2027 Medicare physician fee schedule take effect?

January 1, 2027. CMS released the final rule on November 4, 2026.

What is the 2027 Medicare conversion factor?

$32.63 for clinicians who are not qualifying APM participants, a 2.31% decrease and $32.95 for qualifying APM participants, a 1.83% decrease.

Can I still bill G2211 in 2027?

Not for Medicare dates of service in 2027. Use modifier B1 on the E/M code or B2 if you participate in a Shared Savings Program ACO or a LEAD Model ACO.

Does the same-day E/M reduction apply to 10 day and 90 day global procedures?

No. The final rule limits it to procedures with a 0-day global period.

When does the RPM and RTM employed staff requirement start?

January 1, 2029. CMS delayed it by two years. The initiating visit requirement and the RTM established patient requirement start January 1, 2027.

Where can I find 2027 Medicare payment rates for a specific code?

Use the CMS Physician Fee Schedule Look-Up Tool or the 2027 Addendum B file posted with the final rule.